Home
Leden
Boeken
Auteurs
Clubs
A.G. de Kok
Toevoegen aan favorieten

Auteur

A.G. de Kok

Wikipedia
A.G. de Kok
Deel op Twitter



 
Boeken
 
 
Prikbord
 
 
 
Fans
 
 

Welkom op Boeklezers.nl

Boeklezers.nl is een netwerk voor sociaal lezen. Wij helpen lezers nieuwe boeken en schrijvers ontdekken, en brengen lezers met elkaar en schrijvers in contact. Meer lezen »

Meedoen

Boeken

1
2
Inventory control in multi-echelon divergent systems with random lead times
Inventory control in multi-echelon divergent systems with random lead times
 »
 
 
 
 
 

Single item inventory control under periodic review and a minimum order quantity
Single item inventory control under periodic review and a minimum order quantity
 »
 
 
 
 
 

Supply Chain Management, Vol. 11
Supply Chain Management, Vol. 11
Handbooks in Operations Research and Management Science »
 
 
 
 
 

Co-Evolution of demand and supply under competition
Co-Evolution of demand and supply under competition
 »
 
 
 
 
 

A dynamic programming approach to multi-objective time-dependent capacitated single vehicle routing problems with time windows
A dynamic programming approach to multi-objective time-dependent capacitated single vehicle routing problems with time windows
 »
 
 
 
 
 

What determines product ramp-up performance?
What determines product ramp-up performance?
 »
 
 
 
 
 

The effect of workload constraints in mathematical programming models for production planning
The effect of workload constraints in mathematical programming models for production planning
 »
 
 
 
 
 

Approximations for the waiting time in (s,nQ)-inventory models for different types of consolidation policies
Approximations for the waiting time in (s,nQ)-inventory models for different types of consolidation policies
 »
 
 
 
 
 

Optimal base-stock levels in a serial two-echelon system with random yield and rework of orders
Optimal base-stock levels in a serial two-echelon system with random yield and rework of orders
 »
 
 
 
 
 

Cost implications of planned lead times in supply chain operations planning
Cost implications of planned lead times in supply chain operations planning
 »
 
 
 
 
 

1
2
 
Zoeken
 
Inloggen / Meedoen
 


 Vergeten?
Inloggen via Facebook
Superscanner
 
Meest gelezen deze week
 
Alle toplijsten »
 
Ideeënbus
 

Over
Contact
Alle boeken
   
© Boeklezers.nl